Friday, December 28, 2007

Hunter Thermostat Manual 44260

structure (part two)

To realize the structure of the shelf I used lists of planed spruce section 20x80 mm and length 300 cm, cut to size and assembled with quick-drying wood glue and wood screws 3x35 mm.
In these pictures you can see the results of the first stage of processing.


the structure must still be added to some bars and a reinforced perimeter list whose position will be determined later.
The board support track (in muntistrato 10 mm) per hour is only supported on Specimen layout in order to ensure greater ease in being track-laying and construction of electrical wiring.
The depth of the table was raised to 27 cm to allow the collection of knobs on the drawers.


At this point they begin the first tests in a dry arrangement of switches.

0 comments:

Post a Comment