The installation of the Blue Point has continued with the addition of drawers, which are composed of a harmonic steel wire of 2 mm and a small brass tube with a hole 2.1 mm, which serves as a guide.
a tube of 1 meter in length I have gained with the help of a Dremel cutting disk and thin (0.63 mm), lengths of 3 cm in length, whose ends were polished and smoothed with an abrasive wheel.
To determine the exact position of the drawers is enough to make some simple measurements. One, the share is the same for all the drawers and corresponds to 2.1 cm from the floor onto which is fixed to the Blue Point (of Indeed, it marks a line 2.1 cm from the top of the structures).
To determine where to apply the guidelines and, therefore, simply measure the distance of the horizontal arm on the Blue Point - which will set the drawer - with respect to the head of the shelf and return measurement, edge of the structure (the share of 2.1 cm).
determine the points, I drilled, inserted and fixed with a sealing guides.
While waiting for the glue did take, I also glued the base of the track to the Specimen layout and with the aid of a I saw the tunnel to the edge of the molded base, east side, according to the project.
All visible edges of the shelf will be finished with a strip of masonite 2.5 mm, this band corresponding to the knobs on the drawers I have to drill holes from 4 / 5 cm in diameter to allow the operator easy grip knob on the drawer. Because of these holes will be a visible part of the wooden structure of the shelf I decisto to paint this part with the water stained dark walnut.
Finally, the installation of steel cables.
knobs will be applied only when I installed the band in Mason, in the meantime to facilitate the grip of the clasp on a provisional use of mammout.
knobs in all probability will be chosen between these two models.
0 comments:
Post a Comment