track-laying (second part)

The rails were glued to the slab with normal glue and stopped, when its dry, with the help of some pins.


Close joints between flexible and turnout sleepers I used footage taken from unused track that I played a burglary with a cutter of the imprint of the shoe.


The most challenging part of the installation is complete.


now missing only two sections of the full line above the input switches and the sever, and both will be placed in the following: the first when the wooden structure is completed, the second will be placed on a provisional (not glued) until I have not decided the exact location of industrial buildings.